Why Equipment Access Can Be Just as Important as Equipment Selection

Create a box around a lift station in a civil plan and it’s easy to imagine it as a fully-functional piece of equipment.

The water is actually pumped from a source and then delivered to the station. Access, power, control access to the location structural components, and connections with surrounding infrastructure are also crucial.

If you’re looking for the top lift station designers, it is important to inquire if the engineers consider those interfaces as well as the happens at the station.

Image credit: romtecutilities.com

Commence upstream from the Wet Well

Consider, for instance, the possibility of a new residential development. The wastewater flows from the collection system towards the lift station. The flow conditions for the coming water and site elevations help establish what the station is required to handle.

Once wastewater reaches wet wells and another set of engineering decisions are taken. Valves, pumps, pipes controls, structural components as well as auxiliary equipment have to suit the application.

Romtec Utilities designs wastewater systems designed for commercial, municipal industrial, and other sites as well as applications for development.

That project-specific approach matters because changing the process upstream could alter the goals that the pumping facility must accomplish.

Be sure to follow the water beyond the pumps

The engineering issue doesn’t cease with the liquid leaving the well. The pumping system must be able to push the liquid according to the hydraulic conditions of downstream systems. Station design and the selection of pumps are therefore influenced by the required flow and head conditions.

This is particularly important when it comes to assessing the best wastewater designers. It is not sufficient for a pump’s impressive specifications on its own. It has to also function well within the hydraulic system.

Romtec Utilities has the ability to design the structural elements including mechanical components, electrical components, as well the communication systems for pumping station in a comprehensive package. This allows the system to be synchronized with the specifications set for the particular project.

Stormwater is a network that is its own

Stormwater is an unique infrastructure puzzle. The runoff from the surface that is developed can enter an infrastructure for collection and then pass through detention, drainage, or flood management. Stations that require pumping form part of a larger stormwater management strategy.

For organizations searching for the best stromwater system designers, it is worth examining whether site conditions, flow rates, head requirements, environmental considerations, and the surrounding stormwater plan are evaluated together.

Romtec Utilities offers customized stormwater pumps for industrial, residential commercial and municipal projects, instead of making use of a standard configuration.

Coordination Extends Above Ground Too

There are many interfaces that do not involve pipes. Electrical service needs to be supported by the equipment. Control and communication systems must be compatible with the specifications of the project. Contractors should have the correct plans and documentation. To install, start-up and later services, physical access may be needed.

It can be a complicated project that involves multiple parties and different disciplines, which is why having a clear and concise system document is essential. Romtec Utilities can provide complete project plans and documentation as well as assistance to its systems during beginning, testing and commissioning.

Look Beyond the Station Boundary

A lift station may be designed correctly as a separate facility, but still be part of a poorly-coordinated project if its connections to the outside weren’t given sufficient attention.

A better design view is one that follows the water. Where did it come from? How does it get to the station? What happens while it’s there? What happens when it’s out? What infrastructure allows the entire process to work?

By answering these questions, you can transform the concept of a lift station equipment exercise into infrastructure engineering.